Naveitech 22kW EV Home Charging Box | 380V 32A 3-Phase Type 2 Smart Wallbox Charger with Tuya WiFi, App & RFID Control (IP65)

Naveitech 22kW EV Home Charging Box | 380V 32A 3-Phase Type 2 Smart Wallbox Charger with Tuya WiFi, App & RFID Control (IP65)

Sale price  $531.09 Regular price  $644.09
  • Ultra-Fast 22kW 3-Phase Charging: Delivers up to 22kW charging power (380V/400V AC, 32A), providing up to 10x faster charging speed than standard wall outlets.
  • Smart App & RFID Access: Controlled via Tuya Smart App (WiFi/Bluetooth) for scheduling, remote monitoring, Dynamic Load Balancing (DLB), plus 2 RFID cards for secure access.
  • All-Weather IP65 Durability: Heavy-duty ABS+PC housing with IP65 weatherproof rating and wide operating temperature range (-30°C to 50°C) for reliable indoor/outdoor wall mounting.
  • Integrated Maximum Protection: Built-in RCD Type A leakage protection (30mA AC + 6mA DC) and full CE EMC certification for superior electrical safety.

Payment Methods

Delivery Methods

200W Lightweight Portable Solar Suitcase

This high-wattage solar suitcase is lightweight, portable, and supported by robust kickstands for durability.

Keep Your Batteries Ready for Outages

A charge controller is required for proper setup.

Robust Structure for Consistent Panel Output

Sturdy, rust-resistant kickstands allow maximum power generation, backed by an industry-leading warranty and made with the toughest materials.

Instant Backup Power

Pairs seamlessly with a portable power station for plug-and-play emergency backup power.

Why Choose Naveitech

Redefining excellence in solar solutions.

Package Includes

What's in the Box?

Naveitech 22kW EV Home Charging Box (Model: CDZ22SV01-EU)
x1
RFID Access Cards
x2
Cable Holder Bracket
x1
Wall Expansion Plugs (6 x 60)
x4
Waterproof Screws (M4 x 10)
x4
User Manual
x1

Specs

Technical Specifications

Model CDZ22SV01-EU
Max Output Power 22kW (3-Phase)
Input / Output Voltage AC 380V / 400V ±15% (50/60Hz)
Max Rated Current 32A
Connector Standard IEC 62196-2 (Type 2)
Smart Connectivity Wi-Fi, Bluetooth, Tuya Smart App, RS485, DLB (Dynamic Load Balancing)
Control / Activation RFID Card, App Activation, Bluetooth, Plug-and-Play
Safety Protection Integrated RCD Type A (30mA AC + 6mA DC)
Housing Material ABS + PC (Flame Retardant)
Protection Rating IP65 Weatherproof
Dimensions 380 x 200 x 130 mm (14.9 x 7.87 x 5.12 in)
Operating Temperature -30°C to 50°C (-22°F to 122°F)


FAQ

What compliant deduction paths are available in Germany for the purchase and installation of a 22 kW charging station, with respect to personal income tax filing and employer company-car (Dienstwagen) reimbursement?

In Germany, the purchase and installation of a 22 kW charging station involves clearly defined tax incentives and financial compliance provisions:

  • Labour cost tax deduction (§35a EStG): Under Section 35a of the German Income Tax Act (Handwerkerleistungen), the labour, machinery and transport costs incurred during charging station installation and distribution board retrofit — provided they are itemized separately on the invoice and paid by bank transfer — qualify for a direct 20% tax deduction in the annual personal income tax return (up to €1,200 per year).
  • Company car (Dienstwagen) tax-free subsidy and precise settlement: Where an employee drives an employer-provided company car and charges it at home using a 22 kW charging station, the following applies pursuant to the regulations of the German Federal Ministry of Finance (BMF):
    Flat-rate reimbursement (Pauschale): The employer may pay the employee a fixed monthly tax-free electricity subsidy (e.g., up to €70 per month for pure electric vehicles);
    Precise per-kWh settlement (Spitzabrechnung): Where the employee seeks 100% reimbursement of actual energy consumption from the employer, the 22 kW charging station must be equipped with a metering and encrypted data storage/export function compliant with German calibration law (Eichrecht) — or issue billing exports backed by backend OCA certification. A meter with only MID certification may pose compliance risks in strict tax audits (Betriebsprüfung). Furthermore, employer-funded installation of a charging station for employees qualifies as a tax-free benefit under Section 3 No. 46 EStG.

What communication interfaces and protocols (EEBUS, Modbus, OCPP, ISO 15118) must a 22 kW charging station support for deployment in Germany to ensure future-proof operation?

Given its high charging power, a 22 kW charging station must feature advanced local and remote communication capabilities to operate within Germany's smart grid ecosystem:

  • HEMS and §14a local control interface: The charging station must support EEBUS (Germany's native home energy management standard protocol) or Modbus TCP/RTU interfaces. This enables not only local dynamic load balancing with residential PV inverters and battery storage systems (Batteriespeicher), but also seamless integration with the smart meter gateway (SMGW) and the grid control box (Steuerbox), allowing reception of the curtailment signals mandated under Section 14a of the Energy Industry Act (EnWG).
  • Cloud management protocol (OCPP): The device should natively support OCPP 1.6J or OCPP 2.0.1, allowing users to switch between third-party backend service providers at any time (e.g., for company-car charging data upload or semi-public billing).
  • ISO 15118 and Plug & Charge: Given the long hardware lifecycle of a 22 kW unit, support for ISO 15118-2/20 is a key future-proofing criterion. It enables cardless and app-free "Plug & Charge" authentication, and lays the hardware foundation for bidirectional charging (V2H/V2G) via ISO 15118-20 in the future.

What decisive role does IEC 62955-compliant "6 mA DC leakage detection" play in the compliant installation of a 22 kW charging station in Germany? How does it resolve the "Type A RCD blinding" problem?

Under the German electrical safety standard DIN VDE 0100-722, every EV charging point must be equipped with its own residual current protection mechanism (RCD):

  • Resolving Type A RCD saturation blinding: During high-power AC/DC conversion, an insulation fault in the onboard charger (OBC) can feed smooth DC fault current back into the AC side. Once the DC leakage current exceeds 6 mA, a conventional Type A residual current device (RCD Typ A) in the distribution board becomes magnetically saturated (i.e., "blinded"), thereby losing its earth-leakage protection function for the entire household circuit.
  • Technical advantage of IEC 62955 (RDC-DD): If the 22 kW charging station incorporates an IEC 62955-compliant DC residual current detection device (RDC-DD), the circuit is automatically disconnected within 10 seconds once the DC leakage current reaches 6 mA. This enables the installing electrician to use an affordable, universally available RCD Type A (or RCD Type A EV) directly upstream, eliminating the mandatory requirement for a bulky, expensive standalone RCD Type B. This approach satisfies German VDE acceptance requirements while substantially reducing distribution board retrofit costs.

What hard electrical requirements must be met to upgrade a German household distribution system to support a 32 A three-phase 22 kW charging station? What additional grid costs may arise?

Unlike an 11 kW charging station (16 A, which typically requires no modification to the main distribution), installing a 22 kW charging station (32 A) imposes strict regulatory requirements on the electrical infrastructure of a German household connection:

  • Cable cross-section and thermal losses (DIN VDE 0298-4): Due to sustained high-current operation at 32 A, the copper cable between the distribution board and the charging station generally requires a minimum cross-section of 6 mm² (for short runs) or 10 mm² (for runs exceeding 20 metres or surface-mounted through walls), in order to prevent excessive line losses that could lead to overheating and insulation failure.
  • Main protective switch (SLS) and HAK capacity: The selective main line protection switch (SLS-Schalter) in the main distribution cabinet (Zählerschrank) must be rated at 50 A or 63 A. Where the capacity of the house service connection box (Hausanschlusskasten, HAK) is insufficient (e.g., older buildings equipped with only a 35 A main fuse), a capacity upgrade must be carried out by the grid operator.
  • Building cost contribution (Baukostenzuschuss, BKZ): When a 22 kW connection application causes the household supply to exceed the free basic capacity limit stipulated by the grid (typically 30 kW or 40 kW), the grid operator (VNB) is legally entitled to levy a one-time BKZ capacity charge (typically ranging into the low thousands of euros). This represents the most significant hidden cost of a 22 kW deployment.

If a 22 kW charging station is deployed in Germany for employee company-car reimbursement (Dienstwagen), tenant cost apportionment, or semi-public operation, why is MID certification alone insufficient?

Within the EU, MID certification merely confirms that the metering hardware has been calibrated. Under the German legal framework, however, any scenario involving precise settlement of charges with third parties based on energy metered in kWh must strictly comply with the German calibration law (Eichrecht):

  • Tamper-proof data and transparency: An Eichrecht-compliant 22 kW charging station must incorporate a hardware-encrypted metering module and generate a digitally signed raw data log (Data Log) at the end of each charging session.
  • Transparency software verification (Transparenzsoftware): Employees or paying users can validate the cryptographic signatures on their invoices using independent open-source verification tools (e.g., the SAM validation software), thereby ensuring that the charging station's backend server has not altered any metering data. Operating a 22 kW charging station that holds only MID certification — without Eichrecht certification — on a per-kWh billing basis in Germany exposes the operator to substantial regulatory fines. Additionally, a compliant semi-public 22 kW charging station, once registered under the Charging Station Ordinance (Ladesäulenverordnung, LSV), may also qualify the owner to apply for the German greenhouse gas reduction quota (THG-Quote), generating additional annual revenue.

Compared with an 11 kW charging station, what technical advantages does a 22 kW charging station offer in Germany when combined with dynamic electricity tariffs (e.g., Tibber) and residential photovoltaic (PV) charging?

Germany's electricity market has fully adopted dynamic tariffs based on EPEX Spot prices alongside residential PV generation, and a 22 kW charging station provides distinct advantages in smart responsiveness:

  • Capturing ultra-short low-price windows: When low or even negative electricity prices occur on the European power trading market (typically lasting 1–2 hours), a 22 kW charging station can replenish approximately 11 kWh within half an hour — twice the charging throughput of an 11 kW unit — thereby significantly reducing overall charging costs.
  • Automatic phase switching (Phasenumschaltung) requirements: Because residential PV systems in Germany frequently generate less than 4.1 kW under overcast conditions or during early morning and evening hours, the minimum charging power of a three-phase 22 kW charging station typically amounts to 4.1 kW (3 phases × 6 A). To avoid drawing supplementary power from the grid, a high-quality 22 kW charging station must support seamless, automatic single-phase/three-phase switching — stepping down to single-phase operation (from as low as 1.4 kW) when PV output is low, and reverting to three-phase operation (up to 22 kW) during periods of strong PV generation.

How does a 22 kW charging station comply with the single-phase unbalance load (Schieflast) regulations in German household grids?

Under the German standard VDE-AR-N 4100 (issued by the German Association for Electrical, Electronic & Information Technologies, VDE), German low-voltage grids permit a maximum unbalanced load current of 20 A (approx. 4.6 kW) between phases.

  • Impact on 22 kW charging stations: At rated full output, a 22 kW charging station operates across three phases at 32 A. However, if the connected electric vehicle supports only single-phase charging (e.g., certain earlier models or plug-in hybrids), the charging station must under no circumstances deliver its rated 32 A on a single phase (i.e., 7.4 kW), as this would constitute a violation of the Schieflast regulations.
  • Compliance mechanism: A 22 kW charging station that conforms to German standards must be equipped with dynamic phase monitoring and current-limiting functionality. In single-phase charging mode, the device automatically restricts the maximum output current to 20 A (4.6 kW); only when the vehicle supports balanced three-phase charging is the current permitted to be raised to 32 A, enabling full-speed 22 kW charging.

Can a grid operator (Netzbetreiber) refuse the installation of a 22 kW charging station in Germany? What specific constraints does Section 14a of the Energy Industry Act (EnWG), in force since 2024, impose in this regard?

Under the German Low-Voltage Connection Ordinance (NAV §19), charging stations with a rated output exceeding 11 kW fall under the mandatory approval regime (Genehmigungspflicht), and the grid operator must render a decision within two months. However, pursuant to the new provisions of Section 14a of the Energy Industry Act (§14a EnWG):

  • Prohibition of unjustified refusal: As of 2024, grid operators may no longer reject connection applications for 22 kW charging stations outright on the grounds of local grid overload.
  • Mandatory curtailment and compensation: 22 kW charging stations are classified as controllable consumption devices (SteuVE). In the event of critical grid congestion, the grid operator is entitled to temporarily reduce the charging power (Drosselung), subject to a floor of 4.2 kW to safeguard basic driving range. In return, the vehicle owner is entitled to an annual grid usage fee reduction (Netzentgeltreduzierung), e.g., under Modul 1, a fixed annual discount of approximately €110–190.
  • Downgrade contingency: If the physical capacity of the household service connection (Hausanschluss) is genuinely insufficient and the 22 kW application cannot be approved, an electrician may software-limit the charging station to a maximum output of 11 kW. The device then automatically reverts to notification-only status (Anmeldepflicht) and passes grid acceptance without formal approval.